/

Reactor Skid Fabrication

Reactor Skid Fabrication

Fabricated and commissioned three modular process skids.

CLIENT

Sample Chemicals Ltd.

SECTOR

Process & Chemicals

LOCATION

Riverside Works

YEAR

2024

SCOPE

3 skids

01 — OUTCOMES

Measured after handover

3

Skids commissioned

−22%

On-site install time

0

Weld rework at FAT

02 — CASE STUDY

How the work came together

01

Challenge

The client needed three process skids for a new production unit, but site access was tight and the installation window was short. Field welding on site had to be kept to a minimum.

02

Solution

We designed the skids as self-contained modules, then fabricated, wired and pressure-tested them in our workshop. Factory acceptance tests were witnessed by the client before shipping.

03

Result

All three skids were set in place and connected within days of arrival. Site installation time dropped by about a fifth compared with a stick-built approach.

NEXT STEP

Planning a similar project?

Tell us about your line and its constraints. An engineer will respond within two business days.

NEXT STEP

Planning a similar project?

Tell us about your line and its constraints. An engineer will respond within two business days.

NEXT STEP

Planning a similar project?

Tell us about your line and its constraints. An engineer will respond within two business days.

Create a free website with Framer, the website builder loved by startups, designers and agencies.