02 — CASE STUDY
How the work came together
01
Challenge
The client needed three process skids for a new production unit, but site access was tight and the installation window was short. Field welding on site had to be kept to a minimum.
02
Solution
We designed the skids as self-contained modules, then fabricated, wired and pressure-tested them in our workshop. Factory acceptance tests were witnessed by the client before shipping.
03
Result
All three skids were set in place and connected within days of arrival. Site installation time dropped by about a fifth compared with a stick-built approach.