SCOPE

6 pumping units

01 — OUTCOMES

Measured after handover

−18%

Energy per m³ pumped

6

Pumping units replaced

99.6%

Station availability

02 — CASE STUDY

How the work came together

01

Challenge

A municipal pumping station relied on six ageing pumps with fixed-speed motors. Energy costs were high, and two units failed in the same year.

02

Solution

We replaced the pumps with high-efficiency units on variable-speed drives and upgraded the station controls. Work was sequenced so the station kept at least four units in service at all times.

03

Result

Energy use per cubic metre pumped fell noticeably in the first year. Station availability is now tracked remotely and has stayed above target since handover.

NEXT STEP

Planning a similar project?

Tell us about your line and its constraints. An engineer will respond within two business days.

NEXT STEP

Planning a similar project?

Tell us about your line and its constraints. An engineer will respond within two business days.

NEXT STEP

Planning a similar project?

Tell us about your line and its constraints. An engineer will respond within two business days.

Create a free website with Framer, the website builder loved by startups, designers and agencies.