02 — CASE STUDY
How the work came together
01
Challenge
A heavy-industry site had grown its conveyor network piece by piece over two decades. Transfer points spilled material, and bottlenecks capped the tonnage the plant could move per hour.
02
Solution
We surveyed the full 2.4 km network, modelled material flow and redesigned the worst transfer points. Belts were rerouted to remove two redundant transfers altogether.
03
Result
The site now moves more tonnes per hour with fewer spillage incidents. Maintenance crews spend less time on clean-up and more on planned work.